Clubhouse Render

Opening Fall 2022

Clubhouse Render

Opening Fall 2022

2022 Redesign & Renovation

Completion Fall 2022

St. Johns Golf Club

Opened in 1989, the Bob Walker designed St. Johns Golf Club is an 18-hole public golf course created to use the stunning natural beauty of Florida.

St. Augustine, FL

Currently closed for renovations that include greens, tees, fairways, bunkers, irrigation, drainage, cart paths, infrastructure, driving range, and turf(s). The club house will also be expanded to comfortably accommodate and serve a greater number of visitors with the reveal Fall 2022.

Checkout the Club's FACEBOOK and Instagram for renovation images.

The course opened its doors on January 1, 1989 and has been serving golfers in St. Johns County ever since. On average, around 57,000 rounds of golf are played on this course every year, with a total of just under 2 million since opening. Many groups have called this course home, including men's and women's associations and high school groups, and the relationships with these groups stretches back over many years. Indeed, this course and its clubhouse have become an integral part of the fabric of the local community. 

May 2022 Renovation Update  

  • The Front Nine

Tees, cart path, fairway, drainage, bunkers, and green have been rough shaped.

Tees, cart path, approach, drainage, bunkers, and green have been rough shaped.

Tees, cart path, fairway, drainage, bunkers, and green have been rough shaped.

Tees, cart path, fairway, drainage, bunkers, and green (rock and drainage) have been rough shaped. The irrigation mainline is being installed.

Tees, cart path, approach, drainage, and bunkers have been rough shaped. The green has drainage, rock, and greens mix and has been shaped. The irrigation mainline is being installed.

Tees, cart path, fairway, drainage, and bunkers have been rough shaped. The green has drainage, rock, and greens mix and has been shaped. The irrigation mainline is complete.

Tees, cart path, approach, drainage, and bunkers have been rough shaped. The green has drainage, rock, and greens mix and has been shaped. The irrigation mainline is complete.

Tees, fairway, drainage, bunkers, and green have been rough shaped. The cart path is formed and partially poured. Irrigation mainline and sprinkler head installation is complete.

Tees, fairway, drainage, and bunkers have been rough shaped. The green has drainage, rock, and greens mix and has been shaped. Cart path is complete. The irrigation mainline is complete.

  • The Back Nine

Tees, fairway, drainage, and bunkers have been rough shaped. The green has drainage, rock, and greens mix and has been shaped. Cart path is complete. The irrigation mainline is complete.

Tees, fairway, drainage, and bunkers have been rough shaped. The green has drainage, rock, and greens mix and has been shaped. Cart path is complete. Irrigation mainline and sprinkler head installation is complete.

Tees, fairway, drainage, and bunkers have been rough shaped. The green has drainage, rock, and greens mix and has been shaped. Cart path is mostly complete. Irrigation mainline and sprinkler head installation is complete.

Tees, fairway, and drainage have been rough shaped. The green has drainage, rock, and greens mix and has been shaped. Bunkers have been graded, drained, and shaped. Cart path is complete. Irrigation mainline and sprinkler head installation is complete.

Tees, approach, and drainage have been rough shaped. The green has drainage, rock, and greens mix and has been shaped. The greenside bunkers have been graded, drained, and shaped. Cart path is complete. Irrigation mainline and sprinkler head installation is complete.

Tees, cart path, fairway, drainage, bunkers, and green have been rough shaped. The irrigation mainline is complete. The 2.62-acre pond has been completed and ties in the newly installed drainage down the left side of the fairway.

Tees, cart path, fairway, drainage, bunkers, and green (rock and drainage) have been rough shaped. The irrigation mainline is being installed. The irrigation mainline is complete.

Tees, cart path, fairway, drainage, bunkers, and green (rock and drainage) have been rough shaped. The irrigation mainline is being installed. The irrigation mainline is complete.

Tees, cart path, fairway, drainage, bunkers, and green (rock and drainage) have been rough shaped. The irrigation mainline is being installed. The irrigation mainline is complete.

  • Additional Renovation Updates

The chipping area, putting green, and driving range are rough shaped with drainage installed.

The exterior clubhouse doors will be framed by the end of the week. Lighting is almost entirely installed, and the HVAC is scheduled to be completed soon. In the pro-shop and men’s bathroom, the drywall is done. 

The cart barn lighting is underway, and the last thing for that area is new windows.

The cart paths tying in the tenth tee, cart return, and staging area have been laid out and will be some of the last things completed before grassing that area.

You will see real change with the grassing as holes will look like holes again. 

We look forward to seeing everyone this fall!